Field notes

Blog

Short, practical notes on Canadian building codes — terminology, permit basics, and coverage of amendments and new code editions as they land.

Closed exterior electrical disconnect box and conduit beside a residential heat pump condenser unit
LatestField NotesSeptember 3, 2026

Before You Buy a Heat Pump, Check Your Panel

The quote covers the heat pump. It often does not cover the panel work, the service upgrade, or the utility job a service upgrade can pull in behind it, and that last one has the long lead time.

Read the note

2026

Wall assembly under construction showing batt insulation between wood studs with continuous rigid exterior insulation being installed over the sheathing
Field NotesAugust 20, 2026

R-Value on the Label vs. R-Value in the Wall

The number on the bag describes a piece of insulation sitting on its own in a lab. Every stud, plate and header in the wall you build drags the real number down.

Carbon monoxide alarm mounted on a hallway wall outside a bedroom door, with a gas furnace visible in the background
Field NotesAugust 6, 2026

Where Carbon Monoxide Alarms Go

Smoke rises. Carbon monoxide does not. That changes where the alarm goes, and the requirement is triggered by what is in the house rather than how old or how big it is.

Finished basement suite with a full-size egress window, separate entry door and a small kitchen
Field NotesJuly 23, 2026

What a Basement Suite Has to Have

Ceiling height, a way out of the bedrooms, and separation from the rest of the house. Those three decide whether a basement suite can be approved, and none of them can be fixed once the drywall is up.

Framed house interior with studs, joists and headers exposed before insulation
Field NotesJuly 9, 2026

What Happens at a Framing Inspection

The structure is up and still open, which makes this the last chance to check it. What the inspector is looking for is the load path, the connections, and whether it matches the approved drawings.

Several editions of Canadian building code volumes on a shelf with different publication years
Code WatchMay 7, 2026

Why Canada Is Never on One Code Edition

A model code gets published, and provinces adopt it over the following several years, with amendments. At any given moment the country is spread across two or three editions.

Second-storey balcony guard attached to the building structure, with a long drop to grade below
Field NotesMarch 12, 2026

Guards on Balconies and High Drops

Past a certain drop, a guard stops being a rail and becomes a structural element. Taller, stronger, harder to climb, and connected to something that can take the load.

Open excavation showing water and sewer service connections trenched toward a municipal main
Field NotesJanuary 15, 2026

Site Servicing Runs Ahead of the Building Permit

Water, sewer, storm and the driveway connection are a separate approval from a separate department, and they usually have to be settled before a foundation can go in.

2025

Insulated exterior wall assembly under construction with continuous exterior insulation and taped sheathing
Code WatchDecember 11, 2025

Where Canada’s Energy Codes Are Headed

The direction is settled even where the dates are not: tiered performance targets, tighter envelopes, and buildings ready to run without on-site combustion. What that means for a house being designed now.

Interior wall opened to expose studs and a header, with temporary shoring supporting the ceiling above
Field NotesNovember 7, 2025

What Counts as a Structural Change

Anything that alters how load reaches the ground is structural, including plenty of work that does not look like it. Whether a wall is load-bearing is rarely obvious from below.

Modern residential balcony with a clear glass guardrail on a sunny day overlooking a mountain valley
Field NotesOctober 16, 2025

Working Across Provinces

The technical reasoning travels between provinces. The numbers, the process and the paperwork frequently do not, and experience is what makes people confident about the wrong parts.

Foundation excavation with formwork in place on a cold autumn morning, frost visible on the surrounding ground
Field NotesAugust 21, 2025

Getting Foundations In Before the Ground Freezes

Autumn compresses a construction schedule from both ends. Inspection queues lengthen while the window for excavation and concrete closes, and one of those you cannot negotiate.

Laptop showing a provincial interpretation bulletin beside an open code volume and a notebook
Field NotesJuly 4, 2025

How to Get a Code Question Answered

When a provision is ambiguous, there is an order to work through. Asking the wrong source first is how people end up with a confident answer that carries no weight.

Code volume open at a division showing objectives and functional statements alongside technical provisions
Field NotesJune 19, 2025

Objective-Based Codes, and Why They Matter

Canadian codes state what a requirement is for as well as one accepted way of meeting it. That structure is what makes a different approach possible when the usual one will not work.

Approved permit stamp on a drawing set beside a partially built wall
Field NotesMay 15, 2025

Approved Is Not the Same as Compliant

A permit says the drawings were reviewed and accepted. It does not certify that everything in them, or everything built from them, meets the code. The gap is where disputes live.

Completed interior with finished stairs, handrail and smoke alarm visible before occupancy
Field NotesApril 10, 2025

What a Final Inspection Verifies

The final is a life-safety check on what is visible, plus confirmation that every earlier stage passed. It is not a quality inspection, and it is what closes the permit.

Mixed-use building with retail at street level and residential units above
Field NotesFebruary 13, 2025

Occupancy Classification, in Plain Language

Occupancy classification is the code sorting buildings by what happens inside and how risky that is. Almost every other requirement follows from the class you land in.

Two editions of a building code side by side on a desk with drawings between them
Code WatchJanuary 9, 2025

A New Code Edition Takes Effect: What to Do

The day an edition takes effect, your reference material is out of date, your details may be wrong, and nobody sends a notice. A short checklist keeps the changeover from reaching your projects.

2024

Calendar and code volumes on a desk with a permit application form partly completed
Code WatchDecember 5, 2024

How a Code Transition Period Works

When a province adopts a new code edition there is usually a window where either version can apply. Which one governs your project is decided by a date, and it is usually the application date.

House in a wooded setting with a metal roof, closed eaves and a cleared gravel zone around the foundation
Field NotesOctober 3, 2024

Building for Wildfire: Embers First

Most houses lost to a wildfire are ignited by embers landing on them, not by a wall of flame arriving. That changes which details matter and where the money goes.

Plumbing rough-in with drain lines, vent stack and capped stub-outs in an open stud wall
Field NotesSeptember 12, 2024

What a Plumbing Rough-In Inspection Checks

Drainage slope, venting and a pressure test on the joints. Venting is where most rough-ins fail, and it is the part that never announces itself once the walls are closed.

Surveyor’s total station set up on a residential lot with property stakes and ribbon visible
Field NotesAugust 8, 2024

Surveys: Which One You Need and When

A title search tells you what you own on paper. A survey tells you where it is on the ground, and the two disagree often enough that permits are refused over it.

Level entrance and wide corridor with clear turning space in a small public building
Field NotesJuly 18, 2024

Tracing a Barrier-Free Path of Travel

The path of travel is a continuous route from arrival to the spaces people use. Drawing it as one unbroken line is the fastest way to find where a building fails.

Blower door fan installed in an exterior doorway of a new house during an airtightness test
Code WatchJune 6, 2024

Step Codes and Energy Tiers: How They Work

A tiered energy code replaces a single pass mark with a ladder, and lets a province or a municipality decide which rung applies. It also changes how compliance gets demonstrated.

Deck stair with guard and handrail, showing the triangular opening between tread, riser and bottom rail
Field NotesApril 9, 2024

Why Stair Guards Fail When Deck Guards Pass

The same deck can have a guard that passes along the edge and fails alongside the stair. Measuring off the nosing line and the triangular gap at the bottom step are where it goes wrong.

Electrical rough-in with boxes mounted, cables stapled to studs and conductors left long for termination
Field NotesMarch 13, 2024

What Fails an Electrical Rough-In

Rough-in is the last time the wiring is visible. Most failures are box fill, missing protection, cable support and staple depth, and every one of them is cheap to fix while the walls are open.

Code volume open on a desk with a printed errata sheet beside it
Code WatchFebruary 14, 2024

Errata: How Codes Get Corrected Between Editions

Published codes contain errors, and they get corrected through errata and revisions rather than by waiting for the next edition. The printed copy on your shelf can be out of date without looking it.

A closed manila envelope resting on top of rolled architectural drawings next to a metal scale ruler
Field NotesJanuary 17, 2024

Letters of Assurance, and Who Signs What

On larger projects, professionals sign undertakings that they designed and reviewed specific disciplines. The building department relies on those signatures instead of checking everything itself.

2023

Building permit placard posted in the window of a house under renovation
Field NotesDecember 6, 2023

Which Permit You Need, and When

There is usually one building permit with different application streams behind it, plus separate trade permits. What decides the path is the work, not what you call the project.

Municipal boundary sign on a rural road with new residential construction visible beyond it
Field NotesNovember 15, 2023

Why Requirements Change at the City Limit

Municipalities cannot rewrite the building code, and they can add plenty on top of it. Most local differences come from bylaws and servicing standards rather than from the code itself.

Empty commercial unit being converted, with new partitions marked out on the floor
Field NotesOctober 11, 2023

Change of Use: When the Building Has to Catch Up

Requirements follow how a space is used, not what it looks like. Change the use and the building is measured against a different standard, sometimes without a hammer being lifted.

Wooden stair handrail mounted on brackets along a wall, with a hand-sized profile visible in section
Field NotesSeptember 20, 2023

Why Handrails Fail Inspection

A handrail has to be something a hand can close around and hold during a fall. Most of the ones that fail are attractive, well built, and too wide to grip.

Rolled up architectural blueprints bound with a rubber band next to a red marker on a jobsite plywood table
Field NotesJuly 5, 2023

Why Permit Applications Get Sent Back

Most applications are returned for missing information rather than for a code problem. Every round trip adds weeks, and nearly all of it is avoidable before you submit.

Level entrance with a gentle ramp, wide doorway and lever hardware at the front of a small commercial building
Code WatchJune 14, 2023

Barrier-Free Design: What It Covers and Where

Barrier-free requirements apply mostly to buildings the public enters, and they sit alongside separate accessibility legislation that houses generally escape. Knowing which document governs is half the question.

Marked-up construction drawings on site with red pen annotations showing field changes
Field NotesMay 24, 2023

What As-Built Drawings Are For

Permit drawings show what was proposed. As-builts show what got built. The gap between them is the reason anyone renovating an older building starts by opening a wall to look.

Attached garage interior with drywall on the common wall and ceiling and a self-closing door into the house
Field NotesApril 19, 2023

Fire Separation Between the Garage and the House

An attached garage holds fuel, vehicles and whatever else ended up in there. The separation between it and the house is a continuous assembly, and it fails at penetrations far more often than at walls.

Sub-slab gravel layer with perforated pipe and sealed membrane before a basement slab is poured
Code WatchMarch 8, 2023

Radon Rough-Ins: Cheap Now, Expensive Later

A radon rough-in is a sealed layer under the slab and a capped pipe to the roof. It costs very little during construction and is the difference between a simple fix later and a difficult one.

Municipal notice sign posted on a residential front lawn announcing a development application
Field NotesJanuary 11, 2023

What a Variance Is, and When to Ask for One

A variance is permission to depart from a zoning rule on one property. It is a public process with a timeline and no guaranteed outcome, and it has nothing to do with the building code.

2022

Attic interior showing soffit vents, a clear ventilation path above the insulation, and a ridge vent at the peak
Field NotesDecember 14, 2022

What Attic Ventilation Is For

Attic vents exist to keep the roof deck cold and dry. Most ventilation problems turn out to be air leakage problems, and adding more vents to a leaky ceiling can make things worse.

House framing partly complete with sheathing and taped seams visible on an exterior wall
Field NotesNovember 8, 2022

Code Minimum Is a Floor

The code sets the worst building society will accept, not the best one you can buy. Most of what makes a house comfortable and durable sits above that line.

Site plan showing lot setbacks and building footprint beside a set of construction drawings
Field NotesSeptember 13, 2022

Building Code vs. Zoning Bylaw

One decides whether the building is safe. The other decides whether it may exist there at all. Projects usually die at zoning, and people usually check it last.

Framed interior staircase under construction with stringers cut and treads not yet installed
Field NotesAugust 2, 2022

Stair Rise and Run

Stairs get built to fit the space and then fail on consistency. The difference between the tallest and shortest riser in a flight is the measurement that catches people.

Cross-laminated timber panels and glulam columns being assembled on a mid-rise construction site
Code WatchJuly 19, 2022

Mass Timber and the Move to Taller Wood Buildings

Encapsulated mass timber construction raised the ceiling on how tall a wood building can be. The change rests on how the material behaves in a fire, which is not how people assume wood behaves.

Building official reviewing stamped drawings at a municipal counter
Field NotesJune 7, 2022

What the Authority Having Jurisdiction Decides

Codes are written to be applied by someone with judgement. The authority having jurisdiction is who that is, and their interpretation is what governs your project.

Interior wall framing with polyethylene sheeting installed and sealed at the perimeter before drywall
Field NotesMay 10, 2022

Vapour Barrier vs. Air Barrier

One slows moisture moving through materials. The other stops air moving through gaps. Air leakage carries far more water into a wall than diffusion does, and the two get confused constantly.

New edition of the national model code volumes beside an older edition on a desk
Code WatchMarch 15, 2022

The 2020 Model Codes: What Changed

Energy, accessibility, radon and mass timber were the headline areas. None of it applied anywhere until a province adopted it, which took years and happened at different speeds.

Large basement egress window with a window well and climbable steps, seen from inside a finished bedroom
Field NotesFebruary 21, 2022

Egress Windows: What Makes a Basement Bedroom Legal

A basement bedroom needs a way out that does not use the stair. Four separate tests decide whether the window you have counts, and a window can pass three of them and still fail.

Snow drifted deeply against a dormer and a roof valley on a Canadian house in winter
Field NotesJanuary 12, 2022

Snow Load: Why the Number Changes Town to Town

Snow load is a local number pulled from a table for your specific location, and the snow that piles up unevenly matters more to a roof than the snow that lands flat.